A really productive week of work at the chalet. Stayed dry all week so managed lots of outdoor painting: two coats on the front of the chalet and the porch. Windows at back had two coats on the widow ledges and bottom glazing bars.
Our brilliant Joiner Gordon replaced the three misted up double glazed window units which were getting in the way of the stunning view to the North. He also replaced various roofing sheets to make sure we are ready for another Wester Ross winterand replaced the sarking around the bottom of the chalet beside the front door.
Meanwhile we also got the website updated by our webmaster in Elphin (www.ardmairselfcatering.co.uk). In between times we managed to fit in a couple of beautiful walks: Old Man of Stoer was the highlight.
Sunday, 20 October 2013
October week maintenance
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment